Determine whether you can blow in the insulation from the outside or inside the house., Determine which side of the wall will be best for you to drill into and then repair., If you have a 2 or more story house you may want to consider installing...

18 Steps 7 min read Advanced

Step-by-Step Guide

  1. Step 1: Determine whether you can blow in the insulation from the outside or inside the house.

    Installing cellulose is extremely dusty and dirty.

    Installing from the inside the clean up is considerable.

    Carpets and furniture should be removed or covered.

    Dust will cover the walls, ceiling, windows, floor, basically everywhere.

    Exterior installation, clean up might involve a quick rake and sweep around your house.

    One inch holes have to be drilled between each stud in your wall, above and below all windows and above doors.

    Probably, the biggest amount of time will be spent drilling holes and then repairing them when you are done.
  2. Step 2: Determine which side of the wall will be best for you to drill into and then repair.

    Interior side of the walls are usually dry-wall and can be easily patched but again is messy.

    Exterior side of the wall depends on the type of siding you have on your home.

    You may want to remove a couple of rows of your siding to drill the holes or you can drill through your siding if you can determine whether you can patch it without being noticeable afterward.

    For example, if you have wood siding you could drill through it and then patch with a wooden dowel and wood glue then paint to match the rest of the siding. , Determine where your studs, electric lines, air vents, and anything else you want to avoid during installation.

    Ask yourself if you are comfortable drilling into your walls and that you can repair the holes.

    If you are, then you can continue down this list otherwise it's time to find a contractor. , Usually it's 1 inch (2.5 cm) but if bigger or smaller you'll need to know because the nozzle needs to fit tightly into the holes you drill in the wall.

    If you drilled the hole too big for the nozzle, you'll have problems trying the hold the insulation in or the nozzle will go in too deep and hit the other side of the wall.

    If the holes are too small then you'll have issues with the nozzle clogging. , You'll probably need a stud finder and a tape measure to help you find the studs.

    Try to center the hole between the two studs.

    Start with one hole near the top of the wall 4 to 6 inches (10.2 to
    15.2 cm) below the ceiling or if installing from the exterior then under the floor of the next story.

    During installation you might notice a space will get filled up too quickly compared to other places in the wall.

    At that time you may want to consider another hole about 3 feet (0.9 m) above the floor of that story.

    If installing from the exterior, make sure you do not drill holes above the ceiling of the story, if you do you might end up insulating part of the area between floors or attic instead of your wall. , If it's opened, you'll have to seal the cavity or the insulation will flow down into the basement.

    You are now done with the prep work to install the insulation in the walls, next is the attic. , If you don't have an access door to your attic you'll have to cut into the ceiling between studs or you can even create a door from outside into your attic.

    Do what is ever easier for you. ,, Once inside your attic, be careful not to step through the floor/ceiling.

    Step only on the studs.

    You might want to install wood planks on top of the studs to create a safe crawl way if there isn't one already.

    Before you nail or screw the planks to the stud check the depth of the area from the top of the stud to the bottom of the attic ceiling, some attic ceilings are made with 2x4s or even smaller.

    If it's only 4 inches (10.2 cm) depth you should nail another 2x4 on top of the stud to make the depth deeper so you can install more insulation without burying your walk way.

    Make the board as long as the width of your wood planks.

    Nail them to the studs and then install the wood plank over top.

    Now you have a nice place to sit and crawl. , Ventilation in your attic is very important.

    In the wintertime if heat is trapped in the attic, the heat will melt the snow on the roof and then create ice dams and then you'll have water leaking into your home.

    In the summertime, excessive heat trapped in the attic can damage your roof, usually by warping the wood the shingles are attached to.

    You might already have this problem if there's no insulation in your attic and no vents.

    Usually, air vents are at the top of the roof at the peak or mid-way through and soffit vents underneath bottom of the roof.

    You can buy plastic or foam shields to install to protect the soffit vents from being blocked.

    If there are no soffit or gable vents I would recommend installing some. , The blower should come with a long about 6 inch (15.2 cm) diameter hose and a nozzle that reduces down to 1 inch (2.5 cm).

    Ask for directions from the store you rented it from on how to operate the machine.

    You can use duct tape to secure the hose to the blower and the nozzle to the hose if the blower isn't equipped with a locking mechanism to keep the hose together. , This is at least a two person job.

    One person will operate the blower, turn the machine on and off and fill the hopper with insulation.

    The other person will manage the hose and hold the nozzle tightly into the holes.

    If you drilled more than one hole per space between studs you'll want to start with the lower one and you'll probably want to cover the other hole until you are ready to fill it because insulation will be blown out of the other hole.

    The nozzle should fit tightly into the hole otherwise the insulation will shoot back at you. , Then have the blower operator turn the machine on and slowly start putting insulation into the hopper.

    If the hopper has a gate to stop the insulation start with it closed and then slowly open it.

    You probably shouldn't open it up all the way while using the nozzle.

    The nozzle can clog the insulation inside the hose if the insulation is feed to fast or the nozzle is blocked.

    Try to avoid clogging the hose as best you can.

    The blower will usually sound different, louder and higher pitched, when the insulation has stopped flowing through the hose.

    When this happens turn off the blower right away.

    While filling a hole insulation should flow freely through the hose while there is still room in the cavity.

    The different sound from the blower should signal to the blower operator to run the machine off quickly.

    The nozzle operator might be able to notice the follow has stopped from the hose first and should yell back to the blower operator to turn off the blower to avoid a clog.

    The blower operator will have to juggle the task of constantly and slowly adding cellulose to the hopper and listening to shut down the blower.

    Depending on the height of the wall, it should only take a couple of minutes to fill a cavity.

    If it's taking longer than a couple of minutes then you can open the hopper gate wider and go faster or the cellulose might be escaping to somewhere in the house like your basement or the area between the two floors.

    It's best to turn off the machine between each hole to avoid excess mess.

    That's all there is to it! , You can take the nozzle off for this step.

    One person should control the hose and again another person controlling the blower.

    Start away from your access hole and work your way back to the hole.

    Try to keep the insulation at the same thickness. ,, You can create doors or just cover it back up with dry-wall or plaster to match.

    Just make sure you find a way to insulate the hole first.

    You can purchase foam covers or you can use fiberglass insulation and attach it to the drywall or wood you are using for a door. ,,
  3. Step 3: If you have a 2 or more story house you may want to consider installing from indoors to avoid being high on a ladder or you might want to install the first floor from the exterior and the higher floors from inside.

  4. Step 4: Go to the rental store and check the blower machine that you'll use to see what the nozzle size is.

  5. Step 5: Drill a 1 inch (2.5 cm) hole (or the size of the nozzle) between each stud at the top of each story of the house that you are insulating.

  6. Step 6: Check your basement to see if the first floor wall cavity is sealed or opens up to the basement.

  7. Step 7: Check or create access holes to your attic and knee-walls.

  8. Step 8: Insulate any attic knee-walls with rolls of fiberglass insulation.

  9. Step 9: Prepare a crawl way in the attic so you are able to reach all places in the attic.

  10. Step 10: Prevent your attic ventilation from being blocked with insulation.

  11. Step 11: Rent the blower.

  12. Step 12: Now you can start filling the holes!

  13. Step 13: have the nozzle holder place the nozzle into your first hole.

  14. Step 14: blow the insulation into the attic.

  15. Step 15: Clean up the machine and return it to the store.

  16. Step 16: Seal up your attic access holes.

  17. Step 17: Patch the holes

  18. Step 18: Clean up

Detailed Guide

Installing cellulose is extremely dusty and dirty.

Installing from the inside the clean up is considerable.

Carpets and furniture should be removed or covered.

Dust will cover the walls, ceiling, windows, floor, basically everywhere.

Exterior installation, clean up might involve a quick rake and sweep around your house.

One inch holes have to be drilled between each stud in your wall, above and below all windows and above doors.

Probably, the biggest amount of time will be spent drilling holes and then repairing them when you are done.

Interior side of the walls are usually dry-wall and can be easily patched but again is messy.

Exterior side of the wall depends on the type of siding you have on your home.

You may want to remove a couple of rows of your siding to drill the holes or you can drill through your siding if you can determine whether you can patch it without being noticeable afterward.

For example, if you have wood siding you could drill through it and then patch with a wooden dowel and wood glue then paint to match the rest of the siding. , Determine where your studs, electric lines, air vents, and anything else you want to avoid during installation.

Ask yourself if you are comfortable drilling into your walls and that you can repair the holes.

If you are, then you can continue down this list otherwise it's time to find a contractor. , Usually it's 1 inch (2.5 cm) but if bigger or smaller you'll need to know because the nozzle needs to fit tightly into the holes you drill in the wall.

If you drilled the hole too big for the nozzle, you'll have problems trying the hold the insulation in or the nozzle will go in too deep and hit the other side of the wall.

If the holes are too small then you'll have issues with the nozzle clogging. , You'll probably need a stud finder and a tape measure to help you find the studs.

Try to center the hole between the two studs.

Start with one hole near the top of the wall 4 to 6 inches (10.2 to
15.2 cm) below the ceiling or if installing from the exterior then under the floor of the next story.

During installation you might notice a space will get filled up too quickly compared to other places in the wall.

At that time you may want to consider another hole about 3 feet (0.9 m) above the floor of that story.

If installing from the exterior, make sure you do not drill holes above the ceiling of the story, if you do you might end up insulating part of the area between floors or attic instead of your wall. , If it's opened, you'll have to seal the cavity or the insulation will flow down into the basement.

You are now done with the prep work to install the insulation in the walls, next is the attic. , If you don't have an access door to your attic you'll have to cut into the ceiling between studs or you can even create a door from outside into your attic.

Do what is ever easier for you. ,, Once inside your attic, be careful not to step through the floor/ceiling.

Step only on the studs.

You might want to install wood planks on top of the studs to create a safe crawl way if there isn't one already.

Before you nail or screw the planks to the stud check the depth of the area from the top of the stud to the bottom of the attic ceiling, some attic ceilings are made with 2x4s or even smaller.

If it's only 4 inches (10.2 cm) depth you should nail another 2x4 on top of the stud to make the depth deeper so you can install more insulation without burying your walk way.

Make the board as long as the width of your wood planks.

Nail them to the studs and then install the wood plank over top.

Now you have a nice place to sit and crawl. , Ventilation in your attic is very important.

In the wintertime if heat is trapped in the attic, the heat will melt the snow on the roof and then create ice dams and then you'll have water leaking into your home.

In the summertime, excessive heat trapped in the attic can damage your roof, usually by warping the wood the shingles are attached to.

You might already have this problem if there's no insulation in your attic and no vents.

Usually, air vents are at the top of the roof at the peak or mid-way through and soffit vents underneath bottom of the roof.

You can buy plastic or foam shields to install to protect the soffit vents from being blocked.

If there are no soffit or gable vents I would recommend installing some. , The blower should come with a long about 6 inch (15.2 cm) diameter hose and a nozzle that reduces down to 1 inch (2.5 cm).

Ask for directions from the store you rented it from on how to operate the machine.

You can use duct tape to secure the hose to the blower and the nozzle to the hose if the blower isn't equipped with a locking mechanism to keep the hose together. , This is at least a two person job.

One person will operate the blower, turn the machine on and off and fill the hopper with insulation.

The other person will manage the hose and hold the nozzle tightly into the holes.

If you drilled more than one hole per space between studs you'll want to start with the lower one and you'll probably want to cover the other hole until you are ready to fill it because insulation will be blown out of the other hole.

The nozzle should fit tightly into the hole otherwise the insulation will shoot back at you. , Then have the blower operator turn the machine on and slowly start putting insulation into the hopper.

If the hopper has a gate to stop the insulation start with it closed and then slowly open it.

You probably shouldn't open it up all the way while using the nozzle.

The nozzle can clog the insulation inside the hose if the insulation is feed to fast or the nozzle is blocked.

Try to avoid clogging the hose as best you can.

The blower will usually sound different, louder and higher pitched, when the insulation has stopped flowing through the hose.

When this happens turn off the blower right away.

While filling a hole insulation should flow freely through the hose while there is still room in the cavity.

The different sound from the blower should signal to the blower operator to run the machine off quickly.

The nozzle operator might be able to notice the follow has stopped from the hose first and should yell back to the blower operator to turn off the blower to avoid a clog.

The blower operator will have to juggle the task of constantly and slowly adding cellulose to the hopper and listening to shut down the blower.

Depending on the height of the wall, it should only take a couple of minutes to fill a cavity.

If it's taking longer than a couple of minutes then you can open the hopper gate wider and go faster or the cellulose might be escaping to somewhere in the house like your basement or the area between the two floors.

It's best to turn off the machine between each hole to avoid excess mess.

That's all there is to it! , You can take the nozzle off for this step.

One person should control the hose and again another person controlling the blower.

Start away from your access hole and work your way back to the hole.

Try to keep the insulation at the same thickness. ,, You can create doors or just cover it back up with dry-wall or plaster to match.

Just make sure you find a way to insulate the hole first.

You can purchase foam covers or you can use fiberglass insulation and attach it to the drywall or wood you are using for a door. ,,

About the Author

N

Nathan Cooper

Brings years of experience writing about DIY projects and related subjects.

50 articles
View all articles

Rate This Guide

--
Loading...
5
0
4
0
3
0
2
0
1
0

How helpful was this guide? Click to rate: